To reload data into a database, you must prepare JCL for
the IMS™ HP Load job.
Procedure
- Prepare JCL for IMS HP
Load.
For the JCL requirements, see JCL requirements.
- Code the FRRIN control statements.
FRRIN
control statements control the behavior of the job. See JCL requirements for descriptions of the FRRIN
control statements.
- Submit the JCL to run the job.
- Check the output reports and messages.
For
more information about the reports and messages, see Reports and statistics.