• Välj land/region: Sverige
  • IBM®
  • Site map

  • Utbildning
  • Kurskatalogen

Kursbeskrivning: PowerHA SystemMirror 7 Migration

  • Lägg till min egen katalog
  • Lägg till min träning önskelista

Översikt

  • Målgrupp
  • Förkunskaper
  • Mål
  • Nyckelområden
List of course details in a data table
Kurskod AN65SE Leveranstyp Classroom
(Hands-on labs)
Kurslängd 2.0 dagar Kurstyp
Listpris  Set by Partner    

This course provides you with the information on what's new in PowerHA SystemMirror 7.x, followed by information on upgrading to the 7.1.1 version of the product. It is specifically for PowerHA SystemMirror 7 and later. Migration requirements and techniques are covered including AIX upgrade requirements. The concepts are supported by lab exercises on AIX 6.1, migrating from PowerHA 5.5.

This course provides lectures and hands-on labs in a face-to-face classroom setting. The course is also offered in a live virtual classroom environment (ILO - Instructor Led Online) with hands-on labs PowerHA SystemMirror 7 Migration (ILO) (AX650).

Visa den här kursen i andra länder


Roadmaps:

  • PowerHA SystemMirror for AIX
  • IBM Power Systems and AIX

Tillbaka till toppen

Målgrupp

This intermediate course is intended for those of you who are experienced PowerHA or HACMP system administrators who are responsible for the planning and execution of a PowerHA SystemMirror 7.1.1 upgrade.

Tillbaka till toppen

Förkunskaper

You should have:

  • an intermediate-level knowledge of PowerHA SystemMirror or HACMP
  • and AIX TCPI/IP and LVM.

This can be obtained by taking PowerHA SystemMirror 7 Planning, Implementing, Customizing, Administrating (AN610).

Tillbaka till toppen

Mål

This course will focus on the new features of PowerHA 7.x, including requirements and migrations options for migrating from PowerHA 5.5 to PowerHA 7.1.1. Having completed this course, you should be able to do the following:

  • Understand the new features of PowerHA SystemMirror 7.x
  • Plan a migration to PowerHA 7.1.1
  • Prepare the existing cluster environment for migration to PowerHA 7.1.1
  • Migrate a cluster to PowerHA 7.1.1 using three methods
  • Use the new menu structure in PowerHA 7.x to perform system administration tasks

Tillbaka till toppen

Nyckelområden

  • PowerHA SystemMirror 7.x features
  • Migration considerations and requirements
  • Migration options
  • Verifying the migration and becoming familiar with PowerHA 7.x

Tillbaka till toppen

My IBM

  • Profiländring

E-mail IBM

Vi finns till din hjälp. Skicka ett e-mail till våra utbildning