Oversikt
| Kurskode | AN41NO | Leveringsform | Classroom
(Hands-on labs) |
|---|---|---|---|
| Varighet | 5.0 dager | Kurstype | |
| Listepris | Set by Partner |
This course is designed to prepare students to install and configure a highly available cluster using PowerHA SystemMirror.
View this course in other countries
Roadmaps:
Målgruppe
The audience for this course is students who are experienced AIX system administrators with TCP/IP networking and AIX Logical Volume Manager (LVM) experience who are responsible for the planning and installation of a PowerHA SystemMirror 6.1 cluster on an IBM power systems server running AIX 5L V5.3 or later. The lab exercises are conducted on an AIX 6.1-level system.
Forkunnskaper
Students should be AIX system administrators and have TCP/IP, LVM storage, and disk hardware implementation skills. These skills are addressed in the following courses or can be obtained through equivalent education and experience:
- AIX 5L System Administration (for AIX 5L and networking information) (AN12)
- AIX 5L System Administration II: Problem Determination (for LVM information) (AN13)
Mål
- Explain what high availability is
- Outline the capabilities of PowerHA SystemMirror
- Design and plan a highly available cluster
- Install and configure PowerHA SystemMirror in the following modes of operation:
- Single resource group on a primary node with standby node
- Two resource groups in a mutual takeover configuration
- Configure resource group startup, fallover, and fallback policies
- Perform basic system administration tasks for PowerHA
- Perform basic customization for PowerHA
- Perform basic problem determination and recovery
Nøkkelemner
Day 1
- (00:30) Welcome and course introduction
- (02:00) Unit 1: Introduction to PowerHA SystemMirror
- (01:00) Unit 2: Basic application and resource group considerations
- (01:15) Exercise 1
- (01:15) Exercise 2
Day 2
- (01:00) Unit 3: Basic network considerations
- (01:00) Unit 4: Shared storage considerations for high availability
- (01:30) Unit 5: Initial cluster configuration steps
- (00:45) Exercise 3
- (00:30) Exercise 4
- (01:30) Exercise 5
Day 3
- (01:30) Unit 6: Verification and basic monitoring
- (01:30) Unit 7: Additional network and application considerations
- (00:30) Unit 8: Additional cluster configuration steps
- (01:00) Exercise 6
- (01:00) Exercise 7
- (02:0 0) Exercise 8
Day 4
- (01:30) Unit 9: Basic PowerHA SystemMirror administration
- (01:30) Unit 10: Events
- (01:30) Exercise 9
- (01:30) Exercise 10
Day 5
- (01:00) Unit 11: Problem determination and recovery
- (01:30) Unit 12: PowerHA SystemMirror installation
- (01:30) Exercise 11
- (02:00) Open lab