• Kies een land/regio: Nederland
  • IBM®
  • Siteoverzicht

  • Educatie
  • Cursuscatalogus

Cursusbeschrijving: Power Systems for AIX I: LPAR Configuration and Planning

Overzicht

  • Deelnemers
  • Vooropleiding
  • Doelstelling
  • Onderwerpen
  • Toelichting
List of course details in a data table
Cursuscode AN11V0NL Leermethode Klassikaal
(Hands-on labs)
Duur 3.0 dagen Type cursus Publiek/privaat onsite
Prijs EUR 1.500,00 excl BTW
EUR 1.815,00 incl BTW
   

Learn how to perform system administration in a Power Systems environment. Learn about the features of PowerVM Editions and how to configure and manage LPARs running AIX V7.1 using the Hardware Management Console (HMC).

Bekijk deze cursus in andere landen

Terug naar boven

Deelnemers

This course is appropriate for system administrators, technical support individuals, and IBM business partners who implement LPARs on IBM Power Systems.

Terug naar boven

Vooropleiding

This introductory course does not require any logical partitioning experience.

Terug naar boven

Doelstelling

  • Describe important concepts associated with managing POWER7 processor-based systems, such as logical partitioning, dynamic partitioning, virtual devices, virtual processors, virtual consoles, virtual local area network (VLAN), and shared processors
  • Describe the features of the PowerVM editions
  • Use the System Planning Tool to plan an LPAR configuration
  • Describe the functions of the HMC
  • Configure and manage the HMC, including users and permissions, software, startup and shutdown, remote access features, network configuration, security features, HMC backup and restore options, and the HMC reload procedure
  • Describe the rules associated with allocating resources, including dedicated processors, processing units for micro-partitions, memory, logical host Ethernet adapter, and physical I/O for AIX and Linux partitions
  • Configure and manage LPARs using the HMC graphical user interface (GUI) and HMC commands
  • Interpret physical and AIX location codes and relate to the key hardware components
  • Power on and power off the POWER7-based system
  • Use the HMC to back up and restore partition data
  • Perform dynamic LPAR operations

Terug naar boven

Onderwerpen

  • Introduction to Partitioning
  • Hardware System Overview
  • Hardware Management Console
  • System Planning Tool
  • HMC and Managed System Maintenance
  • System Power Management
  • Planning and Configuring Logical Partitions
  • Partition Operations
  • Dynamic Resource Allocation

Terug naar boven

Toelichting

This course will succeed the System p LPAR and Virtualization I (AU73V0NL) course from September 1st, 2010 onwards, together with the Power Systems Virtualization I (AN30V0NL) course.

Terug naar boven

Mijn IBM

  • Wijzig uw profiel

En verder

  • VTraining

    kijk hier voor de beschikbare cursussen